Industrial · 2021 · Lagos, Nigeria
Regional Logistics Warehouse
A high-bay distribution warehouse with super-flat floor slabs, dock levellers and a steel mezzanine administrative block.
Engineering Challenges
- C1Super-flat floor tolerance for narrow-aisle racking
- C2Poor-bearing subgrade across the full footprint
- C3Aggressive 30-week delivery window
Solutions
- S1Laser screed placement with continuous FM2 verification
- S2Ground improvement using vibro stone columns
- S3Parallel fabrication and groundworks under one programme
Gallery
On site.
Results
Measured outcomes.
FM2
Floor flatness achieved
30 weeks
Delivered on schedule
12 m
Clear internal height