Coastal Approach Bridge

Infrastructure · 2024 · Lagos, Nigeria

Coastal Approach Bridge

A 420-metre steel-composite approach bridge carrying four lanes across tidal wetland, delivered while maintaining marine access throughout construction.

Engineering Challenges

  • C1Soft alluvial strata requiring deep piling below tidal level
  • C2Restricted marine window for launching primary girders
  • C3Corrosion exposure from a permanent saline environment

Solutions

  • S1Driven steel tubular piles socketed into competent bedrock
  • S2Incremental launching from a single land-side assembly yard
  • S3Duplex coating system with 25-year first-maintenance interval

Gallery

On site.

Coastal Approach Bridge construction view 1
Coastal Approach Bridge construction view 2
Coastal Approach Bridge construction view 3

Results

Measured outcomes.

420 m

Total span delivered

0

Lost-time incidents

6 weeks

Ahead of programme