NIELDOB
Arterial Road & Drainage

Government · 2022 · Lagos State, Nigeria

Arterial Road & Drainage

Reconstruction of 9 km of arterial carriageway with a new reinforced concrete drainage spine and box culvert crossings.

Engineering Challenges

  • C1Flood-prone corridor with a 1-in-50-year storm requirement
  • C2Traffic maintained on a critical commuter route
  • C3Extensive uncharted underground services

Solutions

  • S1Hydraulically modelled drainage spine with cast box culverts
  • S2Half-width staged construction with signalised diversions
  • S3Ground-penetrating radar survey before every excavation

Gallery

On site.

Arterial Road & Drainage construction view 1
Arterial Road & Drainage construction view 2
Arterial Road & Drainage construction view 3

Results

Measured outcomes.

9 km

Carriageway reconstructed

1:50

Storm design standard

Zero

Utility strikes recorded

WhatsApp